Skip to content

www.internationalhydrometrygroup.org

Website of the International Hydrometry Group

Reply To: FlowTracker Calibrations (In-House)

Untitled › Forums › International Hydrometry Network › Flow Measurements › ADCP › FlowTracker Calibrations (In-House) › Reply To: FlowTracker Calibrations (In-House)

2024-07-15 at 17:08 #776
dave@genesishydrotech.comdave@genesishydrotech.com
Moderator

    The USGS has a policy where every FlowTracker is tested in a flume at the Hydrologic Instrumentation Facility when purchased, returned from repair, and at least once every 3 years.

     

    Dave

     

    www.internationalhydrometrygroup.org
    Proudly powered by WordPress.